As a result of production challenges, supply delays transpired for some J 35D subsystems, causing the two Preliminary J 35D collection remaining sent with only elements of the prepared avionics put in.Before it was chose to acquire the JAS 39 Gripen in the late 1970s, an intensive examine was carried out on an AJ 35 modification with the remaining